Case Study

Evergreen House

Euston

Our Brief

Located on the doorstep of Euston Station, Bayanix won the role of Main Contractor at Evergreen House. The brief included a full Cat B, Design & Build Office fit out of 8800 sq ft across the 8th & 9th Floors.  

Our client sought to divide the existing open-plan offices, creating private executive workspace and a professional environment. The project required planning and design for various sized private office suites, meeting rooms and washrooms. Large breakout areas with stone-clad island tea points and integrated power and refreshment equipment concluded the brief.

The Bayanix team tailored a bespoke plan to meet the flexible needs of Evergreen House with focus on a corporate, modern feel throughout. We created space for staff and clients to relax and refresh, whilst maintaining a professional ambiance.

ClientBE Offices

Project Duration12 weeks

Ready to get started?

Give our expert team a call 0207 871 1330

Challenges & Solutions

Design & Key Considerations

  • The material palette throughout is generally dark and monochromatic. Accents of brighter colours employed in loose furniture create a sophisticated, corporate aesthetic.
  • Private office suites and collaborative breakout areas provide the flexibility to occupy the space best suited to the task.
  • Special provisions for privacy (GDPR) including full acoustic separation between the offices. Wide band fritted glazing manifestation and full height sheers across all frameless glazed partitioning meet the directive.
  • Digital tennant signage screens and smart panel LED lighting adapts to the natural lighting creating the perfect ‘natural’ all-day glow.
  • ‘Superloo’ Washrooms provide unisex sanitary facilities allowing an increase in occupancy across each floor plate.
  • Back painted glass and porcelain floor tiling create a crisp, modern, high-end feel, whilst observing easy maintenance and longevity.
  • Project programme and delivery dates achieved through efficient work processes and early procurement.
  • In-house tested supply chain ensures superior quality of finish and timely manufacturing.
  • FF&E to breakout areas and meeting rooms include procurement of chairs and feature lighting. Bayanix manufactured tables and benches in-house, especially for the project.

 

Ready to get started?

Give our expert team a call 0207 871 1330

Challenges & Solutions

Design & Key Considerations

  • The material palette throughout is generally dark and monochromatic. Accents of brighter colours employed in loose furniture create a sophisticated, corporate aesthetic.
  • Private office suites and collaborative breakout areas provide the flexibility to occupy the space best suited to the task.
  • Special provisions for privacy (GDPR) including full acoustic separation between the offices. Wide band fritted glazing manifestation and full height sheers across all frameless glazed partitioning meet the directive.
  • Digital tennant signage screens and smart panel LED lighting adapts to the natural lighting creating the perfect ‘natural’ all-day glow.
  • ‘Superloo’ Washrooms provide unisex sanitary facilities allowing an increase in occupancy across each floor plate.
  • Back painted glass and porcelain floor tiling create a crisp, modern, high-end feel, whilst observing easy maintenance and longevity.
  • Project programme and delivery dates achieved through efficient work processes and early procurement.
  • In-house tested supply chain ensures superior quality of finish and timely manufacturing.
  • FF&E to breakout areas and meeting rooms include procurement of chairs and feature lighting. Bayanix manufactured tables and benches in-house, especially for the project.

 

“We are so pleased we chose Bayanix. Our new office space is even better than we hoped and the project was unobtrusive, timely and competitive. We have created extra space within which to host clients and conduct public or private tasks. Their manufacturing provision meant we were not kept waiting. I would not hesitate to choose Bayanix again.”

The Results

Bayanix successfully completed Evergreen House on time and on budget. Our ability to tailor a bespoke design and fulfil every aspect of the brief was bolstered by our manufacturing, provision, shorter lead times and quality craftsmanship.