Case Study

68 King William Street, Level 3 Terrace

City, Monument, EC4N 7HR

Project Overview

Bayanix was engaged as the principal contractor to deliver a high-end refurbishment of the Level 3 terrace at 68 King William Street. This project complements the interior fit-out and stairs previously completed on another phase of the same building. The terrace works included bespoke furniture installation, waterproofing enhancements, and external finishes to create a functional and elegant outdoor space for tenants and visitors.

The transformation highlights Bayanix’s commitment to delivering seamless integrations between interior and exterior spaces while addressing logistical challenges in a live building environment.

Client Objectives

The client’s objective was to revitalise the terrace area, transforming it into a modern, high-quality outdoor space for relaxation and socialising. The works focused on bespoke design elements, durability, and functionality, ensuring the space complemented the building’s interior aesthetics.

ClientHalkin

Project Duration4 months

Collaborations

  • Structural Engineer: Stantec

Project Highlights

Bespoke Terrace Furniture

Bayanix sourced and installed custom-designed furniture that combined functionality and aesthetics, enhancing the usability and visual appeal of the terrace.

Waterproofing Enhancements

A high-performance waterproofing system was installed to protect the underlying structure, ensuring long-term durability and safeguarding the spaces below from potential water ingress.

Elegant External Finishes

The terrace was finished with premium materials that harmonise with the building’s interior, providing a cohesive and sophisticated look.

Ready to get started?

Give our expert team a call 0207 871 1330

Challenges & Solutions

Live Building Logistics

The terrace refurbishment took place in a fully operational building, requiring careful planning to minimise disruptions to tenants and visitors. Bayanix implemented phased works and scheduled deliveries during off-peak hours to ensure smooth operations.

Integration with Existing Features

Coordinating the terrace upgrades with the previously completed internal works posed challenges. Bayanix’s collaborative approach ensured seamless integration and consistency in design and execution.

Weather-Dependent Works

Weather conditions presented challenges for outdoor works. Bayanix mitigated delays by adapting schedules and using protective coverings to ensure continuity.

Ready to get started?

Give our expert team a call 0207 871 1330

Challenges & Solutions

Live Building Logistics

The terrace refurbishment took place in a fully operational building, requiring careful planning to minimise disruptions to tenants and visitors. Bayanix implemented phased works and scheduled deliveries during off-peak hours to ensure smooth operations.

Integration with Existing Features

Coordinating the terrace upgrades with the previously completed internal works posed challenges. Bayanix’s collaborative approach ensured seamless integration and consistency in design and execution.

Weather-Dependent Works

Weather conditions presented challenges for outdoor works. Bayanix mitigated delays by adapting schedules and using protective coverings to ensure continuity.

Added Value

Enhanced Tenant Experience

The revitalised terrace provides a premium outdoor space for tenants, enhancing the building’s overall appeal and usability.

Seamless Coordination

Bayanix’s integration of interior and exterior works ensured a cohesive result that aligns with the client’s vision.

Durability and Longevity

The installation of robust materials and advanced waterproofing systems ensures the terrace’s longevity, reducing future maintenance needs.

“Bayanix has transformed our terrace into an exceptional space that complements the building’s interior perfectly. Their attention to detail and ability to work within a live building environment were outstanding.”

The Results

The Level 3 terrace refurbishment at 68 King William Street reflects Bayanix’s dedication to quality, functionality, and client satisfaction. By addressing logistical challenges and delivering bespoke solutions, the project successfully revitalised an outdoor area that enhances the building’s appeal. This case study demonstrates Bayanix’s expertise in creating cohesive indoor-outdoor spaces that align with client objectives.